Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
A planked-top frame that holds three laundry baskets at counter height — every dimension in this build is derived from the baskets you actually buy, not a fixed cut list.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Outer legs | 4 | 1 1/2" × 3 1/2" × 29 1/4" | 2x4 | ☐ |
| Inner legs | 4 | 1 1/2" × 3 1/2" × 26 1/4" | 2x4 | ☐ |
| Long horizontal frame Formula: (your baskets' inside lip measurement + 3") x 3, plus 3" more. About 60" for typical 1.5-bushel baskets. | 4 | 1 1/2" × 3 1/2" × 60" | 2x4 | ☐ |
| Basket cleats Cut to your basket's actual depth. If that number lands close to 24", cut to 23-7/8" instead to use lumber efficiently. | 12 | 1 1/2" × 3 1/2" × 24" | 2x4 | ☐ |
| Top planking Length matches your basket depth; quantity depends on the stand's overall width — 10 to 12 boards is typical. | 11 | 3/4" × 5 1/2" × 24" | 1x6 | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| 2x4, 10 ft Legs, frame, and basket cleats — estimate; depends on your baskets' dimensions. | 7 each | ☐ |
| 1x6, 8 ft Top planking — estimate. | 3 each | ☐ |
| Self-tapping star bit screws, 2-1/2" | 80 each | ☐ |
| Self-tapping star bit screws, 1-3/4" | 50 each | ☐ |
| Wood glue | 4 oz | ☐ |
| Sandpaper, 120 grit | 4 each | ☐ |
| Paint, stain, or finish | 1 qt | ☐ |
| Laundry baskets, 1.5 bushel Not part of the woodworking cost — buy these FIRST and measure them before cutting anything. | 6 each | ☐ |
Overall cost: $$. Lumber varies by region, species, and season, so we give a band rather than a figure.
Tools: Drill / Driver, Speed Square, Tape Measure. Materials: 2x4, 10 ft, Self-tapping star bit screws, 2-1/2"
Build two frames from the outer and inner legs using the longer screws. Check each for square by measuring opposite diagonals and adjusting until they match exactly — everything else in this build references off these two frames.
Tools: Drill / Driver, Tape Measure. Materials: 2x4, 10 ft, Self-tapping star bit screws, 2-1/2"
Mark the location of the cleats (runners) on both frames at the same height, and attach level inside the frames with two screws per joint. A cleat that's off-level on one end will tip every basket resting on it.
Tools: Drill / Driver, Random Orbit Sander. Materials: 2x4, 10 ft, 1x6, 8 ft, Self-tapping star bit screws, 1-3/4", Sandpaper, 120 grit, Paint, stain, or finish
Attach the long horizontal frame pieces to connect the two end frames into one stand, checking for square again before moving on.
Attach the 1x6 top planking across the frame with the shorter screws, even gaps between boards. Sand, finish, and set the baskets in place.