Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
A compact two-shelf wall unit with scrolled sides, hooks, and cove-moulding trim. The matched scroll-cut sides are the make-or-break step.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Sides Scroll pattern cut to match with a jigsaw. | 2 | 3/4" × 7 1/4" × 17" | 1x8 | ☐ |
| Shelves | 2 | 3/4" × 7 1/4" × 21" | 1x8 | ☐ |
| Center divider (optional) | 1 | 3/4" × 7 1/4" × 10" | 1x8 | ☐ |
| Base | 1 | 3/4" × 5 1/2" × 21" | 1x6 | ☐ |
| Crown (front) | 1 | 3/4" × 1 1/2" × 24" | 1x2 | ☐ |
| Crown (sides) Cut to fit. | 2 | 3/4" × 1 1/2" × 6 3/4" | 1x2 | ☐ |
| Back | 1 | 1/4" × 12 1/4" × 22 1/2" | 1/4" plywood | ☐ |
| Cove moulding Miter 45°, cut to fit. | 1 | 3/4" × 3/4" × 40" | Cove moulding | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| 1x6, 2 ft (Pine) Base. | 2 foot | ☐ |
| 1x8, 8 ft (Pine) Sides, shelves, optional divider. | 1 each | ☐ |
| 1x2, 4 ft (Pine) Crown. | 4 foot | ☐ |
| Cove base moulding, 3/4" x 3/4" | 4 foot | ☐ |
| Plywood, 1/4", scrap Back. | 1 each | ☐ |
| Hooks | 3 each | ☐ |
| Finish nails, 1-1/4" and 2" | 40 each | ☐ |
| Wood glue | 4 oz | ☐ |
Overall cost: $$. Lumber varies by region, species, and season, so we give a band rather than a figure.
Tools: Jigsaw, Random Orbit Sander. Materials: 1x8, 8 ft
Transfer the scroll pattern to both 1x8 sides and cut with a jigsaw, making sure both ends match, and sand any rough areas. Your 1x8s may vary slightly in width, so plan to cut shelves and trim to the actual assembled dimensions.
Tools: Brad Nailer, Drill / Driver, Pocket Hole Jig. Materials: 1x8, 8 ft, Finish nails, 1-1/4" and 2", Wood glue
Attach the shelves to the sides — pocket holes, or 2" finish nails/screws and glue. Leave a 10" space between the shelves.
Tools: Brad Nailer, Drill / Driver. Materials: 1x6, 2 ft, 1x8, 8 ft, Finish nails, 1-1/4" and 2", Wood glue
If you want the center partition, fasten it in place with 2" finish nails and glue (pocket holes won't fit here). Then attach the 1x6 base, fastening to the bottom shelf as well as the sides for strength.
Tools: Brad Nailer. Materials: 1x2, 4 ft, Plywood, 1/4", scrap, Finish nails, 1-1/4" and 2", Wood glue
Add the front crown with 1-1/4" finish nails and glue, then the end pieces cut to fit (your 1x8s vary, so measure). Attach the 1/4" back to square the unit.
Tools: Brad Nailer, Drill / Driver, Level, Random Orbit Sander. Materials: Cove base moulding, 3/4" x 3/4", Hooks, Finish nails, 1-1/4" and 2"
Miter the cove moulding corners at 45° (keep it to 3/4" x 3/4" or smaller for the scale) and glue and tack it on with 1-1/4" nails. Mount the hooks, sand, and finish. Hang by screwing through the 1x6 base into a wall stud.