- Difficulty
- Intermediate
- Time
- 3–6 hours
- Cost
- $$$
About this build
If you have scrap wood piling up all around you, you need this rolling vertical scrap wood storage station. This is the perfect scrap wood storage system because it includes racks for laying long pieces of boards, cubbies for shorter cutoffs, and space for leaning plywood.
Tools
Essential
- Drill / Driver
- Miter Saw
- Pocket Hole Jig
- Random Orbit Sander
- Table Saw
Optional / nice to have
- Tape Measure
Materials
| Item | Qty |
|---|---|
| Plywood sheet, 3/4" x 4' x 8' | 1 board |
| Boards, 8' x 2" x 4" | 7 board |
| 3" Locking casters | 4 each |
| Box of 1 1/4" Kreg pocket hole screws (see tools list) | 1 each |
| Box of 2 1/2" Kreg pocket hole screws (see tools list) | 1 each |
| Wood glue | 1 each |
Overall cost: $$$. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.
Cut list
| Part | Qty | T × W × L |
|---|---|---|
| Base | 1 | 3/4" × 24" × 72" |
| Plywood Edge | 1 | 3/4" × 3" × 72" |
| Vertical Posts | 5 | 1" × 3" × 60" |
| Horizontal Post | 1 | 1" × 3" × 72" |
| Racks with 10 degree angle on one end | 20 | 1" × 3" × 12" |
| Cubby Back | 1 | 3/4" × 9" × 72" |
| Cubby Sides | 4 | 3/4" × 9" × 11" |
What to buy
Buy 12 boards at 8 ft.
1" × 3"
8 boards
3/4" × 24"
1 board
3/4" × 9"
2 boards
3/4" × 3"
1 board
Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →
Instructions
1Attach Casters
Attach casters to the underside of the Base.

2Attach Plywood Edge
Drill five pocket holes along one long side of the Plywood Edge. Using wood glue and pocket screws, attach the Plywood Edge along one side of the Base.

3Attach Scrap Cubbies
- Drill five pocket holes along one long side of the Cubby Back. Using wood glue and pocket screws, attach the Cubby Back to the Base 11 1/4" from the edge.
- Drill two pocket holes on one 9 1/2" and one 11 1/4" side of each Cubby Side. Using wood glue and pocket screws, attach two of the Cubby Sides on the far edges of the Base and the other two Cubby Sides spaced out depending on your needs.

4Attach Vertical Beams
- On each of the Vertical Posts, drill two 3/4" pocket holes on one end and two 1 1/2" pocket holes on the other end. Using wood glue and pocket screws, attach the Vertical Posts to the Horizontal Post with the 1 1/2" pocket hole side.
- Attach one Vertical Post on each end, one in the middle and the other two spaced evenly between. Using wood glue and pocket screws, attach the five Vertical Posts to the Base flush along the back of the Cubby Back.
- Insert a 2" screw through Cubby Back into each Vertical Post for added stability.

5Attach Racks
Drill two pocket holes on the angled end of each of the 20 Racks. Using wood glue and pocket screws, attach the first five Racks into the Vertical Posts along the top edge of the Cubby Back. Using a Rack as a spacer, continue to attach each Rack up each Vertical Post.

6Load It Up
Load in all your wood. Place long boards along the racks, small scraps in the cubbies, and lean plywood on the back side.

7Enjoy!
Enjoy your handiwork and tag @CharlestonCrafted on Instagram with a picture!

Tags
- Storage and Organizing
- Intermediate
Reviews & builds
No reviews yet
Sign in to review this plan or share your build.
No reviews yet. Be the first to build this.