Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
A large media console with open bays, a low controller shelf, and small drawers — part of the board-and-batten collection. Anchors to the wall.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Sides | 2 | 3/4" × 11 1/4" × 48" | 1x12 | ☐ |
| Side trim Cut to match your 1x12 width. | 4 | 3/4" × 1 1/2" × 11 1/2" | 1x2 | ☐ |
| Legs | 4 | 1 1/2" × 1 1/2" × 48" | 2x2 | ☐ |
| Front/back trim | 4 | 1 1/2" × 1 1/2" × 54 1/2" | 2x2 | ☐ |
| Shelves/top | 4 | 3/4" × 11 1/4" × 54 1/2" | 1x12 | ☐ |
| Shelf trim | 1 | 3/4" × 1 1/2" × 54 1/2" | 1x2 | ☐ |
| Back | 1 | 1/4" × 48" × 57 1/2" | 1/4" plywood | ☐ |
| Drawer fronts Assuming 1x8 drawers are 7-1/4" wide — adjust to your 1x8s. | 5 | 3/4" × 11 1/4" × 7 1/2" | 1x12 | ☐ |
| Drawer boxes For ~10-1/4"-wide drawers. | 2 | 3/4" × 7 1/4" × 10" | 1x8 | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| 1x12, 8 ft (Pine) Sides. | 1 each | ☐ |
| 1x12, 10 ft (Pine) Shelves, top, drawer fronts. | 2 each | ☐ |
| 2x2, 8 ft (Whitewood) Legs and front/back trim. | 6 each | ☐ |
| 1x2, 8 ft (Pine) Shelf trim. | 1 each | ☐ |
| Plywood, 1/4", for backs | 1 each | ☐ |
| 1x8, 10" scraps (drawer fronts) (Pine) | 2 each | ☐ |
| Pocket-hole screws, 1-1/4" and 2-1/2" | 50 each | ☐ |
| Brad nails, 1-1/4" | 60 each | ☐ |
| Wood glue | 8 oz | ☐ |
Overall cost: $$. Lumber varies by region, species, and season, so we give a band rather than a figure.
Tools: Brad Nailer, Drill / Driver. Materials: 1x12, 8 ft, 1x2, 8 ft, Brad nails, 1-1/4", Wood glue
Start by trimming out the top and bottom of the 1x12 sides, cutting the trim to match your actual 1x12 width. A nailer is handy; 1-1/4" screws from the back work too.
Tools: Drill / Driver, Pocket Hole Jig. Materials: 2x2, 8 ft, Pocket-hole screws, 1-1/4" and 2-1/2"
Attach the 2x2 legs — these would be the legs of a bookshelf, so think of them that way. Use pocket-hole screws, or 2-1/2" finish nails and glue.
Tools: Drill / Driver, Pocket Hole Jig. Materials: 2x2, 8 ft, Pocket-hole screws, 1-1/4" and 2-1/2", Wood glue
Attach the 2x2 front and back trim with pocket-hole screws (2-1/2") or trim screws and glue. You can do this before or after adding the top — do what makes sense with the parts in hand.
Tools: Drill / Driver, Pocket Hole Jig. Materials: 1x12, 10 ft, Pocket-hole screws, 1-1/4" and 2-1/2", Wood glue
Attach the top to the sides and front/back trim with pocket-hole screws or trim screws and glue, and set the shelves.
Tools: Brad Nailer. Materials: Plywood, 1/4", for backs, Brad nails, 1-1/4"
Add the 1/4" back — strongly recommended on a piece this large, since the back adds a lot of strength. Nail it into the fixed shelf.
Tools: Drill / Driver, Pocket Hole Jig. Materials: 1x12, 10 ft, Pocket-hole screws, 1-1/4" and 2-1/2"
Build the controller shelf and screw it directly to the bottom of the hutch, leaving a 1-1/2" gap behind it for wires. It adds a usable low surface and stiffens the unit.
Tools: Drill / Driver, Random Orbit Sander. Materials: 1x12, 10 ft, 1x8, 10" scraps (drawer fronts), Pocket-hole screws, 1-1/4" and 2-1/2"
Build the small drawers from the 1x8 scraps with 1x12 fronts (adjust the front width to your actual 1x8s). Screw all the pieces together, and anchor the hutch to the wall behind it — safety first on a tall, wide piece. Sand and finish.