This laundry basket shelf holds 6 basic laundry baskets.
- Difficulty
- Beginner
- Time
- 2.3–4 hours
- Cost
- $$$
Cut list
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Top and Bottom | 2 | 3/4" × 24" × 37" | — | ☐ |
| Vertical Supports | 3 | 3/4" × 24" × 37" | — | ☐ |
| Shelves | 4 | 3/4" × 17" × 24" | — | ☐ |
| Backing | 1 | 1/4" × 34" × 39" | — | ☐ |
Materials
| Item | Qty | ✓ |
|---|---|---|
| Plywood, 3/4" Thick Full Sheet | 2 board | ☐ |
| Plywood, 1/4" Thick Half Sheet | 1 board | ☐ |
| 1 1/4" pocket hole screws (see tools list) | 50 each | ☐ |
| Staples | 10 each | ☐ |
Overall cost: $$$. Lumber varies by region, species, and season, so we give a band rather than a figure.
Tools
- Circular Saw
- Drill / Driver
- Impact Driver
- Pocket Hole Jig
- Random Orbit Sander
- Staple Gun
- Bar / Pipe Clamps — optional
- Tape Measure — optional
Instructions
1. Cut Plywood and Drill Pocket Holes
Using 3/4" plywood, cut the following: 3- 24" x 37 1/2" with pocket holes on short sides (vertical pieces) 2- 24" x 37 1/4" no pocket holes (top and bottom) 4- 24" x 17 1/2" with pocket holes on long sides (shelves) Using 1/4" plywood backing, cut the following: 1- 37 1/4" x 39" (backing)

2. Build Box
Using wood glue and 1 1/4" pocket hole screws, attach the 37 1/2" x 24" pieces to the 37 1/4" x 24" pieces.

3. Attach Middle Support
Using wood glue and 1 1/4" pocket hole screws, attach the middle vertical piece (37 1/2" x 24") to the center of the box. It should be about 17 1/2" on each side, but because materials vary, it's best to measure to find center.

4. Attach Shelves
Using wood glue and 1 1/4" pocket hole screws, attach the horizontal shelves, with the pocket holes on the underside. These shelves should be about 12" to 12 1/4" apart.

5. Finish
Sand, putty, and paint or stain your piece.
6. Add Backing
Using staples, add the backing to the back of your shelf.