Skip to content
Storage & Shelving

DIY Laundry Basket Shelves – Free Project Plan

This laundry basket shelf holds 6 basic laundry baskets.

No reviews yet

Difficulty
Beginner
Time
2.3–4 hours
Cost
$$$

About this build

This laundry basket shelf holds 6 basic laundry baskets. It is designed to be the height of a standard washer and dryer. The dimensions can easily be modified to fit any space. This is a basic build, with basic plywood and minimal tools. Perfect for a beginner.

Tools

Essential

  • Circular Saw
  • Drill / Driver
  • Impact Driver
  • Pocket Hole Jig
  • Random Orbit Sander
  • Staple Gun

Optional / nice to have

  • Bar / Pipe Clamps
  • Tape Measure

Materials

ItemQty
Plywood, 3/4" Thick Full Sheet2 board
Plywood, 1/4" Thick Half Sheet1 board
1 1/4" pocket hole screws (see tools list)50 each
Staples10 each

Overall cost: $$$. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.

Cut list

PartQtyT × W × L
Top and Bottom23/4" × 24" × 37"
Vertical Supports33/4" × 24" × 37"
Shelves43/4" × 17" × 24"
Backing11/4" × 34" × 39"

What to buy

Buy 6 boards at 8 ft.

3/4" × 24"

3 boards

3/4" × 17"

2 boards

1/4" × 34"

1 board

Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →

Start building →

Instructions

  1. 1Cut Plywood and Drill Pocket Holes

    Using 3/4" plywood, cut the following: 3- 24" x 37 1/2" with pocket holes on short sides (vertical pieces) 2- 24" x 37 1/4" no pocket holes (top and bottom) 4- 24" x 17 1/2" with pocket holes on long sides (shelves) Using 1/4" plywood backing, cut the following: 1- 37 1/4" x 39" (backing)

    DIY Laundry Basket Shelves – Free Project Plan — step photo 5
  2. 2Build Box

    Using wood glue and 1 1/4" pocket hole screws, attach the 37 1/2" x 24" pieces to the 37 1/4" x 24" pieces.

    DIY Laundry Basket Shelves – Free Project Plan — step photo 6
  3. 3Attach Middle Support

    Using wood glue and 1 1/4" pocket hole screws, attach the middle vertical piece (37 1/2" x 24") to the center of the box. It should be about 17 1/2" on each side, but because materials vary, it's best to measure to find center.

    DIY Laundry Basket Shelves – Free Project Plan — step photo 7
  4. 4Attach Shelves

    Using wood glue and 1 1/4" pocket hole screws, attach the horizontal shelves, with the pocket holes on the underside. These shelves should be about 12" to 12 1/4" apart.

    DIY Laundry Basket Shelves – Free Project Plan — step photo 8
  5. 5Finish

    Sand, putty, and paint or stain your piece.

  6. 6Add Backing

    Using staples, add the backing to the back of your shelf.

    DIY Laundry Basket Shelves – Free Project Plan — step photo 9

Tags

  • Bathroom Shelves
  • Beginner

Reviews & builds

No reviews yet

Sign in to review this plan or share your build.

No reviews yet. Be the first to build this.