Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
A full-height closet tower cut entirely from a single sheet of 3/4" plywood. Straight cuts, screw joinery, and a wall cleat to anchor it.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Sides | 2 | 3/4" × 15 7/8" × 80" | 3/4" plywood | ☐ |
| Shelves | 7 | 3/4" × 15 7/8" × 15 3/4" | 3/4" plywood | ☐ |
| Wall cleats | 5 | 3/4" × 15 7/8" × 3" | 3/4" plywood | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| Plywood, 3/4", 4x8 sheet Ripped into three 15-7/8"-wide x 8 ft strips. | 1 each | ☐ |
| Wood glue | 6 oz | ☐ |
| Closet rod sockets | 4 each | ☐ |
| Closet rods, cut to closet width | 4 each | ☐ |
| Wood trim screws, 2" | 30 each | ☐ |
| Wood screws, 3" Anchoring the cleat to wall studs. | 12 each | ☐ |
| Shelf pins Optional, for adjustable shelves. | 8 each | ☐ |
| Edge banding, 3/4" Optional front-edge finish. | 20 foot | ☐ |
Overall cost: $$. Lumber varies by region, species, and season, so we give a band rather than a figure.
Tools: Circular Saw, Iron for Edge Banding, Table Saw. Materials: Plywood, 3/4", 4x8 sheet, Edge banding, 3/4"
Have the store rip the sheet into three 8-ft strips at 15-7/8" wide, or rip them yourself on a table saw. Then follow the cut list, crosscutting the strips to length with a circular saw. If you want a finished front, iron edge banding onto the exposed front edges now, while the parts are loose and easy to handle.
Tools: Drill / Driver, Drill Bit Set. Materials: Wood glue, Wood trim screws, 2"
Mark the shelf locations on the inside and outside of both sides with tape measure and square. Predrill and countersink, apply glue at each joint, and screw the shelves to the sides. Attach one cleat across the top inside, screwing through the outsides and the top to lock the box square — this same cleat becomes your wall anchor later.
Tools: Drill / Driver. Materials: Shelf pins
Add the remaining shelves the same way as the first, or go adjustable with a shelf-pin jig and pins. If you use adjustable shelves, cut them 1/4" shorter so they drop in and out easily rather than binding.
Tools: Drill / Driver, Drill Bit Set.
Find and mark the wall studs. Attach the wall cleats to the studs with a countersink bit and 3" screws. If there's a baseboard, jigsaw a notch out of the back so the tower sits flat. Then mount the closet rod sockets and hang the rods on either side of the tower.