Skip to content
Outdoor

DIY Counter Height Adirondack Chair – Free Project Plan

A comfortable and roomy Adirondack style chair with foot rest.

No reviews yet

Difficulty
Expert
Time
7–14 hours
Cost
$$$

About this build

A comfortable and roomy Adirondack style chair with foot rest. Relax in style after building this counter height Adirondack stool complete with generous arm rests, a foot rest, sloped seat and curved back. The perfect chair for the patio, yard or any outdoor space.

Tools

Essential

  • Drill / Driver
  • Jigsaw
  • Miter Saw
  • Pocket Hole Jig
  • Random Orbit Sander

Optional / nice to have

  • Bar / Pipe Clamps
  • Combination Square
  • Tape Measure

Materials

ItemQty
Board, 1x2 96"4 board
Board, 1x3 96"3 board
Board, 1x4 96"2 board
Board, 1x5 72"1 board
Board, 1x6 72"1 board
Board, 2x2 72"2 board
Board, 2x4 24"1 board
2" wood screws24 each
1 1/4" pocket hole screws24 each
1 1/4" wood screws24 each
2" pocket hole screws4 each

Overall cost: $$$. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.

Cut list

PartQtyT × W × L
Foot rest13/4" × 4 1/2" × 4"
Foot rest rails23/4" × 3 1/2" × 30"
Foot rest front apron13/4" × 2 1/2" × 4"
Back stretcher13/4" × 3 1/2" × 4"
Arm rest23/4" × 3 1/2" × 27"
Arms23/4" × 2 1/2" × 2"
Bottom back support11 1/2" × 3 1/2" × 4"
Middle back support13/4" × 4 1/2" × 4"
Top back support13/4" × 3 1/2" × 19"
Front legs21 1/2" × 1 1/2" × 30"
Back legs21 1/2" × 1 1/2" × 30"
Seat side supports23/4" × 5 1/2" × 2"
Seat slats133/4" × 1 1/2" × 4"
Back slats23/4" × 2 1/2" × 28"
Back slats23/4" × 2 1/2" × 30"
Back slats33/4" × 2 1/2" × 31"

What to buy

Buy 11 boards at 8 ft.

1 1/2" × 3 1/2"

1 board

1 1/2" × 1 1/2"

2 boards

3/4" × 5 1/2"

1 board

3/4" × 4 1/2"

1 board

3/4" × 3 1/2"

2 boards

3/4" × 2 1/2"

3 boards

3/4" × 1 1/2"

1 board

Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →

Start building →

Instructions

  1. 1Dimensions

    Overall size: 46"h x 28"d x 26 1/4"w

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 5
  2. 2Step 1

    STEP 1: Attach arms to front leg using 2” countersunk screws. Make two opposing sets.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 6
  3. 3Step 2

    STEP 2: Assemble lower stretcher. Attach foot rest side rails to back stretcher using 1 ¼” pocket hole screws.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 7
  4. 4Step 3

    STEP 3: Attach lower stretcher to legs using 2” countersunk wood screws.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 8
  5. 5Step 4

    STEP 4: Attach foot rest front apron to side rails using 1 ¼” pocket hole screws.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 9
  6. 6Step 5

    STEP 5: Attach seat side supports to legs using 2” countersunk screws.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 10
  7. 7Step 6

    STEP 6: Attach back middle support to arms using 1 ¼” pocket hole screws. Then attach to back leg using 2” countersunk wood screws.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 11
  8. 8Step 7

    STEP 7: Attach arm rests to arm and back middle support using 1 ¼” countersunk screws from underside.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 12
  9. 9Step 8

    STEP 8: Attach foot rest to rails using 1 ¼” countersunk screws. Attach seat slats to supports using 1 ¼” countersunk screws.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 13
  10. 10Step 9A

    Use a jigsaw to cut curve into back slats before assembly.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 14
  11. 11Step 9

    STEP 9: Attach back slats to back bottom support using (1) 1 1/4” countersunk wood screw at center of each board.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 15
  12. 12Step 10

    • STEP 10: Attach back bottom support to seat side support rails using 2” pocket hole screw.
    • Adjust back slats to fan out and rest against back middle support.
    • Attach to back middle support using 1 ¼” countersunk screw from front.
    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 16
  13. 13Step 11

    STEP 11: Attach back top support to back slats if desired. Use 1 ¼” countersunk wood screws from front.

    DIY Counter Height Adirondack Chair – Free Project Plan — step photo 17

Tags

  • Adirondack Chairs
  • Advanced

Reviews & builds

No reviews yet

Sign in to review this plan or share your build.

No reviews yet. Be the first to build this.