Loading plan…
Loading plan…
Reaching into the back of a base cabinet is a chore; this fixes it with a shallow wooden tray on drawer slides that rolls the whole shelf out to you. It's a fast, high-impact kitchen upgrade built from a single 1x6, a bit of 2x2, and some scrap plywood, and it slides in without modifying the cabinet permanently.
Because it's a retrofit, everything is cut to fit your cabinet, so the first job is measuring: the clearance opening (remember the door hinges eat into it) and the depth. The source's opening was about 14-1/2" once the hinges were accounted for — measure yours carefully, because a tray built to the nominal opening won't clear the hinges.
Build a simple 1x6 box with a tacked-on 1/4" plywood bottom. The clever part is the 2x2 rails: the drawer slides mount to them, and the 2x2s then either screw to the cabinet shelf from underneath (in a tight cabinet) or sit as a base. Mount the slide pieces level and in the exact same position on both 2x2s — the plan is emphatic about this, because slides that aren't parallel bind. The finished tray lifts out for cleaning, and the 2x2 rails double as a lip that keeps items from sliding off the sides.
| Item | Qty |
|---|---|
| 1x6 board, 8 ftTray box. | 1 each |
| 2x2 board, 4 ftSlide rails / base. | 1 each |
| 1/4" plywood scrapTray bottom. | 1 each |
| 21" drawer slidesSide/bottom mount. | 1 pair |
| Pocket and wood screws, 1-1/4" and 2" | 30 each |
| Finish nails, 1-1/4" | 20 each |
| Wood glue | 3 oz |
Overall cost: $. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.
| Part | Qty | T × W × L |
|---|---|---|
| Tray sides1x6Cut to your cabinet depth. | 2 | 3/4" × 5 1/2" × 20" |
| Tray front/back1x6Cut to your opening minus slide clearance. | 2 | 3/4" × 5 1/2" × 13" |
| Tray bottom1/4" plywood | 1 | 1/4" × 14 1/2" × 20" |
| Slide rails2x2 | 2 | 1 1/2" × 1 1/2" × 21" |
Buy 3 boards at 8 ft.
1 board
1 board
1 board
Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →
Measure the clearance opening of your cabinet — remembering the door hinges take up a little room — and the depth. The example had about a 14-1/2" clearance opening once the hinges were accounted for. These numbers set every cut; a tray built to the nominal opening won't clear the hinges.
With everything cut, build a simple box — 1-1/4" pocket screws or 2" countersunk screws and glue. Keep it square.
Since side/bottom-mount slides carry the load, you can just tack a 1/4" plywood bottom onto the box with 1-1/4" finish nails and glue.
Attach the drawer-slide pieces to the 2x2 rails, mounting them level and in the exact same position on both 2x2s. This is critical — slides that aren't parallel will bind and jam.
Position the whole assembly inside the cabinet. In a tight cabinet, screw the 2x2s to the shelf from underneath; with more clearance, fasten them however suits. Slide the tray in — it lifts out easily for cleaning or finishing, and the 2x2 rails keep items from sliding off the sides.
No reviews yet
Sign in to review this plan or share your build.
No reviews yet. Be the first to build this.