Loading plan…
Loading plan…
This shelf's whole shape comes from two angled side pieces rather than a box — cut the sides at 30° and everything else follows from there, since the front piece attaches with a deliberate gap left at the bottom for airflow. That gap is a real design decision, not a fit issue: produce needs air circulation to avoid rotting in a closed bin, which is the entire point of building this in wood slats rather than a solid container.
Build from the back forward: the back board attaches to the bottom first, nailed about every 4" for a joint that's carrying real produce weight over time, then the angled sides attach to both the bottom and the back. The front piece goes on last, leaving that airflow gap deliberately rather than closing the bin up.
Locate a real wall stud before hanging — this is a loaded shelf meant to hold fruit and vegetables, and 2-1/2" screws into drywall alone won't hold that weight reliably over time. This design publishes in two sizes; the cut list here is the larger bin, with the smaller size's numbers carried in the notes.
| Item | Qty |
|---|---|
| 1x6 board, 72" total (larger bin) | 6 ft |
| 1x3 board, 26-1/2" total (larger bin) | 3 ft |
| Brad nails, 1-1/4" | 30 each |
| Wood glue | 2 oz |
| Self-tapping screws, 2-1/2", for hanging | 3 each |
Overall cost: $. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.
| Part | Qty | T × W × L |
|---|---|---|
| Back1x6 board, 72" total (larger bin) | 1 | 3/4" × 5 1/2" × 26 1/2" |
| Bottom1x3 board, 26-1/2" total (larger bin) | 1 | 3/4" × 2 1/2" × 26 1/2" |
| Sides1x6 board, 72" total (larger bin)Cut at 30° angles. Smaller bin: 5-1/2" sides. | 2 | 3/4" × 5 1/2" × 8 1/2" |
| Front1x6 board, 72" total (larger bin)Smaller bin uses a 1x3 for the bottom/front pairing instead — see source for the swapped size. | 1 | 3/4" × 5 1/2" × 26 1/2" |
Buy 2 boards at 8 ft.
1 board
1 board
Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →
Nail the back board to the bottom board with 1-1/4" brad nails and wood glue, nailing about every 4" for a joint that will carry real produce weight.
Cut the sides at 30° angles with a miter saw, circular saw, or jigsaw. Attach to the shelf bottom and back with 1-1/4" brad nails and wood glue.
Nail the front piece to the sides with 1-1/4" brad nails and wood glue, leaving a deliberate gap between the front and bottom for airflow.
Locate real studs in the wall and hang the shelf to them with 2-1/2" self-tapping screws — a loaded produce shelf needs a real stud, not just drywall anchors.
No reviews yet
Sign in to review this plan or share your build.
No reviews yet. Be the first to build this.