Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
The 8x8 raised deck platform that playhouses get built on — 4x4 posts, 2x6 framing, real joists. Build it dead level and everything on top of it goes up easy.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Posts Swing-set option: two at 47" and two at 96". | 4 | 3 1/2" × 3 1/2" × 47" | 4x4 | ☐ |
| Shorter side boards Includes the joists. | 8 | 1 1/2" × 5 1/2" × 92 1/2" | 2x6 | ☐ |
| Longer side boards | 4 | 1 1/2" × 5 1/2" × 96" | 2x6 | ☐ |
| Diagonal corner supports Both ends mitered 45°. | 8 | 1 1/2" × 5 1/2" × 12" | 2x6 | ☐ |
| Deck boards | 16 | 1 1/2" × 5 1/2" × 96" | 2x6 | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| 4x4 post, 8 ft Three if building the swing-set option. Ground-contact treated. | 2 each | ☐ |
| 2x6, 8 ft Frame, joists, and decking. Eight can be 92-5/8" studs if cheaper. | 29 each | ☐ |
| 2x4, 8 ft Under-deck cross bracing. | 4 each | ☐ |
| Exterior deck screws, #9 x 2-1/2", self-tapping | 150 each | ☐ |
| Exterior deck screws, #10 x 3", self-tapping The framing screws. | 100 each | ☐ |
| Exterior paint or stain | 1 gallon | ☐ |
Overall cost: $$$. Lumber varies by region, species, and season, so we give a band rather than a figure.