Loading plan…
Loading plan…
Step-by-step build — 7 steps. Also available as a print sheet.
For each unit, attach the sides to the toekick with 1-1/4" brad nails and wood glue.
Attach the front to the sides, flush on top and sides, with 1-1/4" brad nails and wood glue.
Attach the bottom shelf to the sides and the toekick with 1-1/4" brad nails and wood glue.
Attach the back top support to the back top corner with 1-1/4" brad nails and glue. Attach the interior 1x10 shelf, flush to the back, with 1-1/4" brad nails and glue, leaving about 6" of space under the bottom shelf.
Attach the plywood back panel with 5/8" brad nails and wood glue.
For the sink unit, attach the top frame with 3/4" pocket holes and 1-1/4" pocket hole screws. Then attach the top pieces to the tops of both the stove and sink units with 1-1/4" brad nails and glue.
Build each door frame from 1x3s sized to the actual opening, joined with 3/4" pocket holes and 1-1/4" pocket hole screws (two per joint). Attach a 1/4" plywood panel to the back of each frame with 5/8" brad nails and glue — the panel should be about 1" larger than the frame's center opening, not the full door size. On the stove, attach the acrylic glass cooktop with a suitable glue or predrilled small hardware screws. Hang each door with surface mount hinges on the side and a magnetic clasp to keep it closed, then add knobs or handles.