Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
A three-story rolling dollhouse with fully open sides — 3/4" plywood floors on a 2x2 frame, angled roofline, cut stair openings, and caster wheels for pushing between rooms.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Vertical frame posts | 7 | 1 1/2" × 1 1/2" × 32" | 2x2, 8 ft | ☐ |
| Horizontal ties | 6 | 1 1/2" × 1 1/2" × 24" | 2x2, 8 ft | ☐ |
| Roofline angle pieces, non-parallel Both ends cut at 30° off square, ends not parallel, long point measurement. Source omitted this length — 20" is an estimate for a modest roof pitch; measure your own assembled frame and desired pitch before cutting. | 4 | 1 1/2" × 1 1/2" × 20" | 2x2, 8 ft | ☐ |
| Roofline angle pieces, parallel One end cut at 30° off square, long point measurement. | 4 | 1 1/2" × 1 1/2" × 37 5/8" | 2x2, 8 ft | ☐ |
| Floor panels Cut per the diagram into the three story floors and walls. | 1 | 3/4" × 24" × 96" | 3/4" PureBond plywood, full sheet | ☐ |
| Roof strips Cut into scalloped lapped strips. | 1 | 1/4" × 13 1/2" × 48" | 1/4" plywood scraps | ☐ |
| Stair treads Stacked and staggered. | 10 | 3/4" × 1 1/2" × 13 1/2" | 1x2, 8 ft | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| 3/4" PureBond plywood, full sheet Have it ripped into a 24" and a 13-1/2" strip at the store. | 1 each | ☐ |
| 2x2, 8 ft | 7 each | ☐ |
| 1/4" plywood scraps Roof strips. | 1 each | ☐ |
| 1x2, 8 ft Stairs. | 2 each | ☐ |
| Caster wheels, 2", with screws for 3/4" stock | 4 each | ☐ |
| Self-tapping star bit screws, 3" (or pocket hole screws, 2-1/2") | 60 each | ☐ |
| Pocket hole screws, 1-1/4" | 40 each | ☐ |
| Brad nails, assorted | 60 each | ☐ |
| Wood glue | 5 oz | ☐ |
Overall cost: $$$. Lumber varies by region, species, and season, so we give a band rather than a figure.