Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
A four-shelf wall unit from two 1x8s — decorative jigsawed ends, hidden 1x2 hanging cleats, and shelf spacing that's marked once and traced everywhere.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Sides Decorative end cuts stay within 4" of each end. | 2 | 3/4" × 7 1/4" × 41" | 1x8 | ☐ |
| Shelves | 4 | 3/4" × 7 1/4" × 28 1/2" | 1x8 | ☐ |
| Hanging cleats Flush to the back, under the top shelf and above the bottom one. | 2 | 3/4" × 1 1/2" × 28 1/2" | 1x2 | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| 1x8, 8 ft The two sides. | 1 each | ☐ |
| 1x8, 10 ft The four shelves. | 1 each | ☐ |
| 1x2, 8 ft The two hidden hanging cleats. | 1 each | ☐ |
| Brad nails, 2" | 40 each | ☐ |
| Wood screws, 3" Into studs. Two per cleat. | 4 each | ☐ |
| Wood glue | 4 oz | ☐ |
| Paint and wood filler | 1 qt | ☐ |
Overall cost: $$. Lumber varies by region, species, and season, so we give a band rather than a figure.
Tools: Jigsaw, Random Orbit Sander, Speed Square, Tape Measure. Materials: 1x8, 8 ft
Draw your end curve on one side — staying inside the top and bottom 4", because that's where the outer shelves land — cut it with the jigsaw, sand it fair, and trace it onto the second side. Cut and sand that one to the line.
While both sides are clamped together, mark every shelf position across both at once: top and bottom shelves 4" in from the ends, the middle two spaced 10" apart. Shelves are 3/4" thick — mark both edges of each so nothing lands a half-thickness off.
Tools: Brad Nailer, Speed Square, Tape Measure. Materials: 1x8, 10 ft, 1x2, 8 ft, Brad nails, 2", Wood glue
Glue and fasten the four shelves between the sides on your layout marks — 2" brads or screws, three per joint. Square the assembly by matching diagonals before the glue sets; a shelf unit assembles as a parallelogram with astonishing ease.
Add the two 1x2 cleats flush to the back: one tight under the top shelf, one on top of the bottom shelf. Glue and brads.
Tools: Drill / Driver, Random Orbit Sander, Tape Measure. Materials: Wood screws, 3", Paint and wood filler
Fill the brad holes, sand, and paint — a painted build forgives every filled hole.
Find the studs, level the shelf, and drive the 3" screws through both cleats into framing. The cleats exist precisely so this step is boring: real screws, real wood, real studs, and a shelf that holds actual books instead of decorative ones.