Loading plan…
Loading plan…
Add a drawer and shelf to your Kreg Workbench frame to give you plenty of storage for all your screws and jigs! The perfect workbench set up for small shop spaces with room for bulky items on the shelf below and smaller accessories in the drawer.
| Item | Qty |
|---|---|
| Plywood, 3/4" 4'x4' sheet | 1 board |
| Plywood, 1/4" 2'x2' sheet | 1 board |
| 3/4" coarse thread pocket hole screws | 18 each |
| 1 1/4" coarse thread pocket hole screws | 18 each |
| 1 1/4" fine thread pocket hole screws | 10 each |
| Pair 16" ball bearing drawer slides | 1 each |
| 1 each |
Overall cost: $$$. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.
| Part | Qty | T × W × L |
|---|---|---|
| Bottom Shelf | 1 | 3/4" × 19" × 27" |
| Back Panel | 1 | 3/4" × 5" × 27" |
| Front Spacer Blocks | 2 | 3/4" × 1" × 5" |
| Drawer Braces | 2 | 3/4" × 5" × 18" |
| Drawer Box Sides | 2 | 3/4" × 4" × 16" |
| Drawer Box Front/Back Pieces | 2 | 3/4" × 4" × 21" |
| Drawer Bottom | 1 | 1/4" × 16" × 23" |
| Drawer Front | 1 | 3/4" × 5" × 23" |
Buy 5 boards at 8 ft.
1 board
1 board
1 board
1 board
1 board
Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →
Tip: Check manufacturer's instructions Make sure to follow manufacturer's instructions to assemble the workbench frame and attach the top.
Tip: Using screws from the bottom The rails in the workbench have predrilled holes to drive your screws through. Flip the workbench on its side for easier access.
Cut two pieces of 3/4" plywood to 1 7/8" x 5 1/2". Install one piece on the inside of each front leg like shown so that they are touching the top rail. Use 3/4" pocket holes through the predrilled holes in the legs to secure.
Tip: Pay attention to the back corners Make sure the back corners are square! Note that the inside edge of these drawer braces at the front are 1 7/8" from the inside corner of the legs. So they should be 1 7/8" from the inside corner of the legs at the back as well. Use a square to double check the back panel and drawer braces are square to each other while installing. If they aren't you'll have issues with the drawer once installed.
Install (1) pair of 16" ball bearing drawer slides onto the braces from the previous step so that they are 3/4" inset from the front legs. Install these flush along the bottom edge of the drawer brace panels.
Tip: Installing Drawer Slides For more information on installing drawer slides, see the link below.
Install drawer box onto slides so that the front of the box is 3/4" inset from the front of the legs and the top is approximately 1 1/4" below the top rail.
No reviews yet
Sign in to review this plan or share your build.
No reviews yet. Be the first to build this.