Loading plan…
Loading plan…
Use your browser's Print (Ctrl/Cmd + P) and choose Save as PDF. This page works offline once you've opened it with a signal.
Framed, sheathed, roofed. The biggest build in the catalog and the one most likely to need a permit.
| Part | Qty | T × W × L | Material | ✓ |
|---|---|---|---|---|
| Skids | 3 | 3 1/2" × 3 1/2" × 120" | PT Lumber | ☐ |
| Floor joists 16" on center inside the rim joists. | 8 | 1 1/2" × 5 1/2" × 93" | PT Lumber | ☐ |
| Floor rim joists | 2 | 1 1/2" × 5 1/2" × 120" | PT Lumber | ☐ |
| Wall studs 16" on center. 89" gives an 8-ft wall with plates. | 32 | 1 1/2" × 3 1/2" × 89" | SPF | ☐ |
| Wall plates Double top plate, single bottom plate, lapped at the corners. | 10 | 1 1/2" × 3 1/2" × 120" | SPF | ☐ |
| Rafters Gable roof, ~6/12 pitch. Birdsmouth cut where they land on the top plate. | 12 | 1 1/2" × 5 1/2" × 66" | SPF | ☐ |
| Ridge board | 1 | 1 1/2" × 7 1/4" × 120" | SPF | ☐ |
| Item | Qty | ✓ |
|---|---|---|
| Pressure-treated 4x4, 8 ft (skids) PT is correct here — it's in contact with the ground and nobody is eating off it. | 3 each | ☐ |
| Pressure-treated 2x6, 10 ft (floor joists) | 8 each | ☐ |
| Plywood, 3/4" T&G, 4x8 (floor) | 3 sheet | ☐ |
| SPF 2x4, 8 ft (wall framing) Studs 16" on center. Buy 10% extra — you will find crooked ones. | 45 each | ☐ |
| SPF 2x6, 10 ft (rafters) | 12 each | ☐ |
| Plywood/OSB, 1/2", 4x8 (wall + roof sheathing) | 11 sheet | ☐ |
| Roofing felt + asphalt shingles About 120 sq ft of roof plus waste and starter course. | 4 each | ☐ |
| Drip edge, flashing, ridge cap Skip the flashing and you will find out where the water goes. | 1 each | ☐ |
| Exterior siding (T1-11 or lap) | 7 sheet | ☐ |
| Framing screws / nails, exterior rated | 800 each | ☐ |
| Door hardware (hinges, hasp, handle) | 1 each | ☐ |
| Gravel for the pad ~2 cubic yards of crushed stone. A dead-flat, well-drained base is the whole foundation. | 2 each | ☐ |
Overall cost: $$$$$. Lumber varies by region, species, and season, so we give a band rather than a figure.