Loading plan…
Loading plan…
Step-by-step build — 4 steps. Also available as a print sheet.
Attaching the Side assemblies to the Base is just a matter of positioning them as shown, and then driving in 11/4" coarse-thread pocket-hole screws. Some of the hole positions are a bit tight to reach with the driver bit, but the square drive on Kreg Pocket-Hole Screws allows a bit of leeway in the driver-bit angle, so you’ll have no problems. In our case, the filter was slightly smaller than the fan, so we nailed a small strip of leftover screen molding in place to push the filter up a quarter inch. To wrap it all up, mount the casters, slide the fan and filter in place, and you’re ready to start working in cleaner air.