- Difficulty
- Intermediate
- Time
- 2–3.8 hours
- Cost
- $$
About this build
These Shelves are built to offer strong storage. They’re built a lot like the “Garage Storage Shelves” that I also posted. These have slats instead of plywood shelves, though, which makes them perfect for storing gardening supplies, potting soil, etc.
Tools
Essential
- Brad Nailer
- Drill / Driver
- Miter Saw
- Pocket Hole Jig
Optional / nice to have
- Bar / Pipe Clamps
- Combination Square
- Tape Measure
Materials
| Item | Qty |
|---|---|
| Board, 2x3 96" | 9 board |
| Board, 1x2 96" | 15 board |
| 2 1/2" coarse thread pocket screws | 64 each |
| 1 1/4" 18-gauge brads | 120 each |
Overall cost: $$. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.
Cut list
| Part | Qty | T × W × L |
|---|---|---|
| Legs | 4 | 1" × 2" × 72" |
| Short Rails | 8 | 1" × 2" × 18" |
| Long Rails | 8 | 1" × 2" × 46" |
| Shelf Slats | 60 | 3/4" × 1" × 23" |
What to buy
Buy 24 boards at 8 ft.
1" × 2"
9 boards
3/4" × 1"
15 boards
Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →
Instructions
1Cut the Parts
- Cut 4 legs, 8 long rails, and 8 short rails from 2x3s, like the cut diagram shows.
- Then you can drill the pocket holes in all the rails. Make sure you're set up for 1 1/2" thick boards when you drill.
- Then you can cut all of the slats. You'll want a miter saw, and a stop block is really handy. That way, you can just get one slat right, set up the stop, and then butt your boards against that and cut the rest of the slats without measuring.

2Assemble the Ends
Now you can put together the ends by screwing the short rails to the legs. Use 2 1/2" pocket screws for this, and make sure that the rails are aligned on each end--I put one together with it laying on the floor, then put the parts for the other end right on top of it so I could easily line everything up.

3Add the Long Rails
Attach the long rails next, using the 2 1/2" screws again. Make sure that the long rails are positioned 3/4" below the top edge of the short rails. That way, when you attach the slats next, the short rails will be aligned.

4Add the Slats
Now it's time to attach the slats. I jut dabbed a little glue on each one, set it in place, and then attached them all using a brad nailer. You could use a hammer and nails, but that's a lot of hammering. Just use this as your excuse to go buy a nail gun and a compressor. They don't cost much these days.

Tags
- Bedroom
- Intermediate
Reviews & builds
No reviews yet
Sign in to review this plan or share your build.
No reviews yet. Be the first to build this.