Loading plan…
Loading plan…
Step-by-step build — 9 steps. Also available as a print sheet.
Build the face frames first, so you can be sure the door and drawer-face openings fit before anything else is built.
Build the two working doors to fit their openings and hang them with hinges, keeping them in place with catches for now. Do this before attaching anything else — it's much easier now than later. Keep track of which door goes in which opening.
Before attaching any of the box pieces, drill 3/4" pocket holes on the front and back edges of every box piece, so the face frame can be attached easily in a later step. Hide these holes on the inside, underside, or top of the cabinet.
Assemble the box from the top, bottom, and sides.
Attach the face frame to the box using the pocket holes drilled earlier.
Attach the decorative (non-functional) drawer faces across the remaining openings, trimmed with the 1x3 face trim.
Add the center divider and shelves inside the cabinet at the desired locations. Install knobs or handles on every drawer face, including the decorative ones, so the whole front reads consistently.
Attach the top boards and front trim to the cabinet.
Attach the back panel with glue and brad nails, if desired.
Sand every surface and finish.