- Difficulty
- Intermediate
- Time
- 3.3–6.5 hours
- Cost
- $$$
About this build
This mobile workbench is a quick and easy DIY build that you can get done in just one weekend! Equipped with a large table top, extra shelving storage, and with mobile capability - making it the perfect workshop necessity!
Tools
Essential
- Brad Nailer
- Drill / Driver
- Jigsaw
- Miter Saw
- Pocket Hole Jig
- Random Orbit Sander
Optional / nice to have
- Bar / Pipe Clamps
- Tape Measure
Materials
| Item | Qty |
|---|---|
| Birch Plywood, 3⁄4”x4x8 | 1 board |
| Pieces of wood, 4x4x8 | 2 board |
| Pieces of wood, 2x4x8 | 4 board |
| Pieces of wood, 1x2x8 | 2 board |
| Box of 2.5" Kreg Pocket Hole Screws (See tools list) | 1 each |
| 3-Inch Caster Wheels | 4 each |
| Wood Glue | 1 each |
| Wood Filler | 1 each |
| Paint or Stain (Optional) | 1 each |
| Polyurethane | 1 each |
| Box of 1 3⁄4” Construction Screws | 1 each |
| Plastic Wood | 1 each |
| 120 Grit Sandpaper | 1 each |
Overall cost: $$$. Lumber prices vary by region, species, and season, so we give a band rather than a figure we would only be pretending to know.
Cut list
| Part | Qty | T × W × L |
|---|---|---|
| Legs | 4 | 4" × 4" × 29" |
| Large Side Supports | 4 | 2" × 4" × 53" |
| Small Side Supports | 4 | 2" × 4" × 15" |
| Table Top | 1 | 3" × 24" × 62" |
| Shelf | 1 | 3" × 18" × 55" |
| Table Top Framing- Mitered at 45 Degrees | 2 | 1" × 2" × 62" |
| Table Top Framing- Mitered at 45 Degrees | 2 | 1" × 2" × 24" |
What to buy
Buy 10 boards at 8 ft.
4" × 4"
2 boards
3" × 24"
1 board
3" × 18"
1 board
2" × 4"
4 boards
1" × 2"
2 boards
Assumes 8 ft stock, a 1/8" saw kerf, and buying each part at its own width. Change the board size or kerf on the full board plan →
Instructions
1Pocket Holes
Drill two pocket holes on each side of all your small and large supports. After making all your pocket holes, go ahead and sand down all your pieces using an orbital sander and 120 grit sandpaper.

2Side Frame
Attach 2 of the small side supports (2x4x15”) to two of the legs. Your first small support will go on the inside at the very top of the legs. Your second small support will go 4” up from the bottom of the legs. Use clamps, wood glue, and 2.5” Kreg Jig pocket hole screws to secure them together.

3Front/Back Supports
Attach your large supports in the same exact positions - at the very top of your legs and 4” from the bottom of your legs.

4Table Top
Using your Kreg Jig RipCut and AccuCut cut your plywood down to size for the table top (3⁄4” x 24” x 62”). Then attach your table top to your legs and support using 1 3⁄4” construction screws. Two screws per leg, four screws to your large support and three to your small supports. Conceal your holes using plastic wood or wood filler.

5Shelf
After cutting down your shelf to size, you will use your jigsaw to cut out notches on all four corners so that your shelf will sit on your legs and on top of your bottom supports. Each notch will be 1.5” in from the side and 1.5” in from the bottom. Attach your shelf with 1 3⁄4” construction screws and conceal your holes with plastic wood or wood filler.

6Attach Wheels
Using 3” caster wheels attach them to the bottom of your legs using 2.5” screws and washers!

7Table Top Framing
- I wanted the table top to have the look of a thick countertop without the cost associated with that. So, I framed out the table top using 1x2’s!
- Miter your 1x2’s for a more finished look.
- Attach your 1x2’s using wood glue and 1 1⁄4” brad nails. **Make sure your 1x2’s line up exactly with your tabletop - this will make a completely flat surface. Conceal your nail holes using plastic wood or wood filler.

8Paint/Stain
This step is optional - you can definitely leave it as exposed wood. However, I decided to prime and paint my workbench. Used 123 Primer and Behr Cabinet and Trim in Semi-Gloss in Polar Bear. Sealed with 2 thin coats of water based matte poly.

Tags
- Workbenches
- Intermediate
Reviews & builds
No reviews yet
Sign in to review this plan or share your build.
No reviews yet. Be the first to build this.