Loading plan…
Loading plan…
Step-by-step build — 15 steps. Also available as a print sheet.
There is a detailed cut list and diagram provided in the Parts section. There is also a PDF download in the Extras section that contains detailed measured 3D drawings for this project. The first step is to break down the plywood into manageable strips. You will rip the piece lengthwise into a 10” strip, two 3-3/4” strips, a 3” strip, and a 1-1/2” strip. The remainder is scrap.
Next, cut each of these parts to a final length of 36”. I prefer a miter saw with a stop block to ensure they are all the same length. Save the offcut from the 10” wide Board. It will be used to make the side pieces in the next step. The rest of the offcuts are scrap.
Setup your jig and drill all of the pocket holes in each part. Any jig will work, but I love my benchtop model when batching out a lot of parts like this. I definitely recommend hooking it up to a vacuum. It keeps the jig and bit clean and cool and keeps the mess to a minimum.
Next, drill the holes in the shelf and bottom for routing the power cords. I did this with a forstner bit at the drill press, but you can also use a handheld drill. Hole saws can also be used in place of the forstner bit, and are usually cheaper. The shelf gets 1-1/2” holes and the bottom gets a 2” hole.
Use the scrap wood as spacers to hold the shelf (upside down) off your work surface by 3/4”. Next clamp the front trim and back piece in place and attach with 1-1/4” pocket screws.
Pre-drill and countersink for screws along the top edge of the back per the diagram. There are 3 holes that are 16” apart so the shelf can be attached to 3 wall studs. The shelf should be centered over an outlet if possible. Using #8 x 2-1/2” screws, attach the shelf to the studs, starting with the center hole. Check for level, then install the outer two screws.
There are two pocket holes on the bottom that face the wall. They are 32” apart and should line up perfectly with the wall studs. Using 1-1/4” pocket screws, attach the shelf to the outer studs through these holes. The screws in the last step are more than enough to support the weight of the chargers and batteries, but these screws will add stability and prevent the shelf from tipping up if hit from the bottom.
Route the cords through the holes in the shelf and then through the hole in the bottom. It is a good idea to mark each cord near the plug with a label to prevent confusion later. You can hide excess cord in the chase or wrapped up behind the charger. You’re done!